Liebert Ship-Ahead Input/Output Cabinet NXL Manuale Utente

Navigare online o scaricare Manuale Utente per Gruppi di continuità Liebert Ship-Ahead Input/Output Cabinet NXL. Liebert Ship-Ahead Input/Output Cabinet NXL User's Manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 20
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
AC Power
For Business-Critical Continuity™
Liebert
®
NXL
Ship-Ahead Input/Output Cabinet
Installation Manual – 250-400kVA, 60Hz
Vedere la pagina 0
1 2 3 4 5 6 ... 19 20

Sommario

Pagina 1 - AC Power

AC PowerFor Business-Critical Continuity™Liebert® NXL™ Ship-Ahead Input/Output CabinetInstallation Manual – 250-400kVA, 60Hz

Pagina 2 - Product Warranty Registration

Electrical Installation6Top Cable EntryWhen making the power connections, the recommended order of pulling and installing cables is to start from the

Pagina 3 - TABLE OF CONTENTS

Electrical Installation7Notes on Tables1. Nominal input current (considered continuous) is based on full-rated output load. Maximum current includes n

Pagina 4

Electrical Installation8Table 6 Recommended lug sizesCable SizeT&B Series 54000One HoleT&B Series 54000Two Hole#8 AWG 54930BE 54850BE#6 AWG 54

Pagina 5 - SAVE THESE INSTRUCTIONS

Installation Drawings93.0 INSTALLATION DRAWINGSFigure 1 Input/output conduit detail drawing, 250-300kVA Liebert NXL UPSOUTPUTNEUTRALINNER PANELREMOVED

Pagina 6 - 1.0 MECHANICAL INSTALLATION

Installation Drawings10Figure 2 Input/output conduit detail drawing, 400kVA Liebert NXL UPSNOTES:1. ALL DIMENSIONS ARE IN inches (mm).2. 24" MINI

Pagina 7 - 1.4.2 Clearances

Installation Drawings11Figure 3 Top cable entry routing and installation orderThe cables must be routedaround the fault braces. This isto prevent the

Pagina 8 - 2.0 ELECTRICAL INSTALLATION

Installation Drawings12Figure 4 Bottom cable entry routing and installation orderSIDE VIEWFAULT BRACEOUTPUTFAULT BRACERECTIFIER INPUTFAULT BRACEBYPASS

Pagina 9 - Equipment Ground

Installation Drawings13Figure 5 Floor mount brackets—standard and optional layoutWARNINGBrackets MUST remain attached to the frame until theunit is be

Pagina 10

Installation Drawings14

Pagina 12 - Table 6 Recommended lug sizes

CONTACTING LIEBERT FOR SUPPORTTo contact Liebert Services for information or repair service in the United States, call 1-800-LIEBERT (1-800-543-2378).

Pagina 13 - 3.0 INSTALLATION DRAWINGS

EmersonNetworkPower.comEnsuring The High Availability0f Mission-Critical Data And Applications.Emerson Network Power, the global leader in enabling bu

Pagina 14 - Installation Drawings

iTABLE OF CONTENTS1.0 MECHANICAL INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21.1 Intr

Pagina 16

1IMPORTANT SAFETY INSTRUCTIONSSAVE THESE INSTRUCTIONSThis manual contains important instructions that should be followed during installation of your L

Pagina 17 - BOTTOM VIEW (Standard)

Mechanical Installation21.0 MECHANICAL INSTALLATION1.1 IntroductionThis following section describes the requirements that must be taken into account w

Pagina 18

Mechanical Installation31.4.1 Moving the CabinetsThe Liebert NXL Input/Output Cabinet can be handled with a forklift or similar equipment.When moving

Pagina 19

Electrical Installation42.0 ELECTRICAL INSTALLATIONThis chapter provides guidelines for qualified installers who must have knowledge of local wiring p

Pagina 20 - SL-25440_REV0_05-08

Electrical Installation5The following are guidelines only and are superseded by local regulations and codes of practice where applicable:• Take specia

Commenti su questo manuale

Nessun commento